Casting: Difference between revisions

From Vintage Story Wiki
no edit summary
No edit summary
No edit summary
(One intermediate revision by one other user not shown)
Line 24: Line 24:


==Smelting Metal == <!--T:5-->
==Smelting Metal == <!--T:5-->
Smelting is performed in a crucible. The crucible will hold four complete stacks of 128 nuggets, but only one material type, base metal or alloy, may be smelted at a time.  
Smelting is performed in a crucible. The crucible will hold four complete stacks of 128 nuggets, but only one base metal or alloy may be smelted at a time. To smelt an alloy, the appropriate mix of ore nuggets must be placed in the crucible prior to heating.


===Preparing the Crucible=== <!--T:6-->
===Preparing the Crucible=== <!--T:6-->
Line 107: Line 107:


== Tutorial Video: Casting == <!--T:14-->
== Tutorial Video: Casting == <!--T:14-->
<youtube>sAx5JxFjWyw</youtube>
<youtube>sAx5JxFjWyw</youtube
>
<youtube>JjcJAR-ROsI</youtube>




Confirmedusers, editor
388

edits